Жилой дом с гостиницей и офисами

Жилой дом с гостиницей и офисами

The design stage:

- draft proposal (2003)

- working draft  (2003 - 2004)

Construction stage

Built 

Involvement:

- full

The authors’ team

- archit. Topoev N.S. 

- archit. Miroshnichenko A.V.