Puppet Theatre

Puppet Theatre

The design stage:

draft proposal (1982-1984)

working draft  (2003 - 2004)

Construction stage

Built (1985)

Involvement:

- full

The authors’ team

- archit. Topoev N.S. 

- archit. Frolov V.G.