Petrovskiy Passage

Petrovskiy Passage

Design stage:

 - draft proposal  (2004)

 - working draft  (2004-2005)

Construction stage:

 - Built 

Involvement:

 - full

The authors’ team:

- archit. Topoev N.S. 

- archit. Miroshnichenko A.V.

- archit. Bespalov G.Y.